Client: King Arms Hotel, Keswick
Services: Electrical/Mechanical
The Project
We have recently carried out mechanical and electrical works for Bell UK to complete a refurbishment at this beautiful restaurant & hotel; The Kings Arms Hotel, Keswick.






"The work entailed a replacement of a thermostat in a hot water tank and replacing a faulty switch on a storage heater. The response time was very quick, within the hour. The electrician carried out the work quickly and efficiently and was very helpful and informative about both jobs.
I would not hesitate to call Mitchell's again for any other electrical work work I would require. I can only say how pleased I was about the whole job. The firm were helpful, efficient and courteous throughout the whole experience."
Replacement of thermostat
"I received a quote for a new boiler and chose to go with Derek Mitchell.
Arrangements were made for the work to commence and the installation engineer arrived on time and fully equipped to carry out the work.
He was very professional and efficient in carrying out the work and was able to get the gas supply reconnected in a very short time to allow use of other gas appliances.
During the course of the work, I asked if it would be possible to make some alterations to the piping arrangement to allow zonal control and this was done without any complaints or issues.
All in all, I am very happy with the company and the way in which they carry out their services. This will be my first choice for any future gas or electric work that I might require."
Removal of old boiler and installation of new
Client: King Arms Hotel, Keswick
Services: Electrical/Mechanical
The Project
We have recently carried out mechanical and electrical works for Bell UK to complete a refurbishment at this beautiful restaurant & hotel; The Kings Arms Hotel, Keswick.
Full design & build of electrical and mechanical services for Westland's Country Park.
Full design & build of electrical and mechanical services for Grange Quarry at their Lockerbie site.
Supply & installation of a new oil boiler and chemical flushing of the existing heating system pipe work.