Testimonial
"We have recently had a desk designed and fitted by one of your joiners - Richard. This process went extremely smoothly with no hitches at all. We are very impressed with the desk and the quality of the work and attention to detail.
We can't thank him enough and we just wanted to make sure you were aware of his excellent work ethic and commitment to doing a job properly and going that extra mile. In our experience this type of workmanship is very rare these days."
Design and fit of desk
"All in all, I am very happy with the company and the way in which they carry out their services. This will be my first choice for any future gas or electric work that I might require."
Removal of old boiler and installation of new
Client: Dumfries & Galloway Council
Project: Supply & installation of a new oil boiler and chemical flushing of the existing heating system pipe work
Services: Boiler services/Mechanical
Duration: 4 months
Requirements
Isolation of existing boiler, strip out and dispose of existing boiler, supply & installation of a new Oil boiler and chemical flushing of the existing heating system pipework.
Approach
The new installation comprises of the following new system:
- New oil-fired boiler interlinked to existing installation in malleable steel pipework to feed the existing system
Result
Project completed on time and within budget.